1. Site preparation: Determine the site for the installation of organic fertilizer equipment, ensure that the site is smooth, the bearing capacity meets the requirements of the equipment, and consider drainage and ventilation.
2. Transport and unload the equipment: Transport the equipment to the site, and unload the equipment to ensure that the goods are intact. Foundation construction: According to the basic drawings and requirements of the equipment, the foundation is measured, arranged and constructed to ensure that the foundation is smooth and firm.
3. Device installation: Install and assemble the device according to the device installation drawings and operation manuals, including the installation, connection, and adjustment of each component.
4. Conveyor system installation: If the organic fertilizer production equipment needs a conveyor system, such as belt conveyor, screw conveyor, etc., the corresponding installation and connection need to be carried out.
5. Pipeline connection: Connect and seal the hydraulic, pneumatic or liquid transmission system of the equipment.
6. Equipment commissioning: After the installation of the equipment, the equipment commissioning work, including equipment operation test, transmission system inspection, lubricating oil addition, etc.
7. Safety protection: Install the safety protection device to ensure the safe operation of the equipment.
8. Equipment cleaning and maintenance: After installation, clean the equipment to ensure that the surface of the equipment is clean; At the same time, do a good job of daily maintenance of equipment to extend the service life of organic fertilizer production line.
During the installation, strictly follow the installation instructions and related specifications to ensure installation quality and safety. If necessary, it is best to install by a professional equipment installation company or technical personnel to ensure the normal operation and safe use of the equipment.