Organic fertilizer equipment chain crusher debugging guide

2023/12/25

1. Preparation

Before commissioning, ensure that the device has been installed and auxiliary facilities such as the power supply and gas pipe have been connected properly. At the same time, check whether the components of the organic fertilizer equipment are complete, whether they are loose or damaged.

Second, adjust the chain tension

The chain is an important part of the chain crusher, and the tension needs to be checked and adjusted regularly. Too loose will cause chain vibration, too tight will affect the bearing life. When adjusting, you can use special tools or feel to judge.

Third, adjust the hammer and screen

The hammer and screen are important parts of the mill and need to be checked and adjusted regularly. Adjust the number and weight of the hammer as needed to suit the size and hardness of different materials. At the same time, the screen aperture is adjusted according to the need to adapt to the different grinding particle size.

4. Test run

After adjusting the components, it can be tested. During the test run, it is necessary to pay attention to the operation of the equipment, such as whether there is abnormal sound, vibration, heat and other phenomena. If there is an anomaly, it is necessary to stop the machine in time.

5. Maintenance after adjustment

Once debugging is complete, everything is not done. It is also necessary to perform regular maintenance on the equipment, such as replacing worn parts and cleaning the residue inside the equipment. Although these tasks seem simple, they are very important to ensure the long-term stable operation of organic fertilizer production lines.