In the winter low temperature environment, in order to ensure the normal operation of organic fertilizer equipment and extend the service life, the following are some key protection measures:
1. Equipment cleaning: When the fertilizer production line is idle, each fertilizer processing equipment should be thoroughly cleaned, including internal and external, to prevent corrosion and blockage caused by material residues and moisture.
2. Lubrication maintenance: Due to the large temperature change in winter, too low temperature may cause the equipment to start or run slowly, so it is recommended to add oil to the equipment to improve the lubrication of various parts of the equipment.
3. Preheating and buffering: When opening the organic fertilizer equipment, do not immediately set the high speed, should give the equipment a buffer time, and then gradually change the speed level when the equipment is preheated.
4. Anti-rust treatment: For the iron parts of organic fertilizer equipment, they should be disassembled in winter, coated with anti-rust paint, and placed in a ventilated and dry place to prevent rust and extend service life.
5. Motor protection: the motor that is not used for a long time should be placed in a ventilated, dry and clean warehouse to avoid moisture and affect the insulation performance.
6. Enhanced coverage: For production environments such as greenhouses, timely replacement of damaged or insufficient thermal insulation covering to ensure that the temperature conditions meet the requirements of vegetable production.
7. Temperature management: When the outdoor temperature at night is below 10 ° C, the greenhouse should be covered with thermal insulation covering in time to ensure that the night temperature in the greenhouse is above 15 ° C.