Before installing the pig manure organic fertilizer production line, it is necessary to pay attention to the following issues to ensure the correct installation of the equipment and subsequent smooth operation:
1. Check the installation foundation: Before installation, check whether the dimensions of each installation foundation meet the requirements of the drawing according to the plan and foundation drawing of the organic fertilizer equipment. If there are any differences, repairs are made until the dimensions are correct.
2. Equipment inspection and acceptance: Before installation, check and acceptance should be carried out according to the equipment list to ensure that the equipment is not deformed, damaged or lost during transportation, and corresponding measures should be taken before installation to ensure that each equipment is in good condition.
3. Check the rotating parts: After installation, the rotating parts must be rotated flexibly, without jamming, collision, and percussion. The connecting parts shall be firm and sealed, and there shall be no powder leakage, air leakage, oil leakage, etc.
4. Electrical equipment installation: the installation of electrical equipment should comply with the relevant provisions of the state, the line should be clear, no running, leakage phenomenon, wires and cables should have a protective shell to prevent mouse bites.
5. Test run: After all equipment is installed, each single machine should be no-load test run, and can be put into load test run after normal operation.
6. Load test run: Before load test run, calibrate the electronic batching scale and packaging scale to achieve the specified accuracy. Run with load for a certain time, no fault before delivery to the manufacturer for production and use.
Ensuring that these steps and precautions are properly handled can greatly improve the installation quality and reliability of the later operation of the organic fertilizer production line.