Installation site of a sludge paver in Luding, Sichuan

2026-09-07

The images show that the equipment uses a large gantry-style steel structure with a green paint finish as its main frame. The main beam spans across the concrete fermentation tanks (or sludge pools) on both sides, with a green square hopper fixed in the middle to receive sludge or fermentation materials transported from outside. Below the beam, rows of black metal turning and turning teeth are suspended, arranged vertically downwards with their bottoms close to the bottom of the tank. The two ends of the main beam are supported above tracks along the edge of the tank, and the support legs are connected to wheels for longitudinal movement along the tank. A guardrail is also installed directly above the beam, but it is not yet fully enclosed. The background shows the steel frame and a red crane boom in the distance, indicating that the installation and hoisting phase is underway.