The operational details when turning off the organic fertilizer equipment are very important to ensure the safety of the equipment and extend the service life. Here are the specific shutdown steps:
1. In the preparation stage, stop feeding: first stop the feeding equipment to ensure that the materials in the equipment fully enter the next section to avoid the materials remaining inside the equipment.
2. Gradually reduce the load: After stopping the feeding, gradually reduce the operating load of the equipment, so that the equipment runs at low load.
3. Shut down devices in sequence: shut down devices one by one based on the running sequence of devices. Ensure that the material in the equipment has been completely processed.
4. Cut off the power supply: After the device completely stops running, cut off the power supply of the host, and unplug the device head.
5. Clean up the equipment: After shutting down the equipment, clean up the equipment thoroughly, including removing residual materials and dust, especially the transmission parts and sealing parts.
6. Maintenance check: Carry out necessary maintenance work, such as checking the lubrication of the equipment, tightening bolts, etc., to ensure that the equipment can run normally when the next startup.
7. Record and report: record the operating status and maintenance of the organic fertilizer production line. If there is any abnormal situation, it should be reported and dealt with in time.
Through the above steps, you can ensure that the organic fertilizer equipment is safe during the shutdown process and ready for the next startup.